TAPE-EASE 13423
Zander Rd. Maribel, WI 54227
920-863-3571 or 1-888-443-3461 fax:
1-920-863-3570
Pricing may change without notice, Please
refer online to Web-Site, or call for current information
With
our products, your Cabinet Refacing project will be a breeze and turn out
like a new set of cabinets. We will supply you with Cabinet Doors,
plain or finished,
veneer,
stain,
and free advise on doing your kitchen. With our system, you use
thin veneer for the cabinet boxes with no need for saws or mess, our
veneer is real
wood that cuts with a scissors or razor knife. We now also offer
1/8"
veneer end panels
that can be pre-finished, cut to your sizes and contact cemented on.
Your outside
corners of your cabinets will look real, not with a piece if scribe
trim that
looks out of place. Others also use plywood and nail through the
face,
have you ever seen new cabinets with nails in the face frames???
Look through our Standard Moldings & Choose scribe moldings,
Crowns
& much more also offered in Pre-Finished.
You
will only be able to veneer flat-front doors.
First determine if you would like
to purchase new doors or veneer your old ones.
You will only be able to veneer flat-front doors. For a quote
on new doors, please
use one of our forms.
FIGURING AMOUNT OF VENEER NEEDED:
Our Peel & Stick veneer only comes in 2' x 8'. Our wood backer veneer comes in
4' x 8'.
Measure the width and height of the area and divide it by 144. This will give
you the sq. ft.
needed for each piece. Each 2' x 8' sheet has 16sq. ft and 4 x
8' are 32 sq. ft. Figure at
least one extra sheet for waste. You can sketch out a lay-out drawing to help
you figure
out the yield per sheet for your sizes needed. For strips of veneer for doing
face frames,
simply figure how many 8' long strips you can yield from a sheet accordingly.
If you
are using standard,
exposed self-closing hinges, the
actual door size should be
1/2" larger than the opening (1/4" overlay).
HINGE BORE FOR CONCEALED HINGES:
Our standard program is for Compact 33 concealed
hinges is a 1/2" overlay.
This means that you size your doors at 1" larger than the
openings. With our standard
program, we will drill the doors and supply you with our 1/2" hinge mounting
plates.
Width and height of your doors may be changed to
your preference.
If your cabinets have a face frame, you can change the
overlay. For other brands
of hinges, frameless or inset doors, you must supply us with the hinge bore
specs.
We can have your doors pre-drilled
for concealed hinges.
We also supply Blum
brand Concealed Hinges.
You can
also purchase a drill bit and drill the doors yourself if your doors have many
different overlays and you want to fit the doors as you install them. Click
Here.
The Blum Compact 33 Hinges use a 35mm hole
NOTE: Face frame cabinets will have apprx. 2" framing
material behind the doors.
Framless cabinets have 3/4" wide up-right dividing panels behind the doors.
Inset doors are flush mounted inside the face frame openings.
FINISHING TO MATCH:
If you
order Pre-Finished Doors, you may need to finish items for your project that are
only available in un-finished. You can order extra stain or paint but we do not
sell our
clear finishes. Many Clear Finished out there will match our finish. A
Semi-Gloss sheen
finish matches our standard finish best. Varnish, Lacquer or Polyurethane
finishes will
all work. It is best to bring a sample to a local paint store for advice and
testing. Spraying
on the finish is the best but brushing can be done also using Polyurethane.
Small Spray Cans
can be used also but they apply the finishes very thin and many coats would be
needed.
DOVETAIL DRAWER BOXES:
For new dovetail drawer boxes, the width is 1"smaller than the opening
and the height is 3/4" smaller. Depth will be the same as your old
drawers or about 4" less than the cabinet depth.
This will allow you to use easy glide
Full Extension Drawer
Guides.
Measure your cabinet depth and choose the size for the drawer guides
exact, or to the next smaller size. These mount to the side of the
cabinet
and blocking is required inside the cabinet to mount these
guides to. This
blocking should be installed flush with the edge of the face frame and span
from the face frame to the back wall of the cabinet box.
Dave Daus from Tape-Ease has done
kitchen cabinet refacing for over 20 years.
Please review all the information on this page.
Or you can call Dave, he will make sure your job turns out right the first time!!!
STEP BY STEP:
1.
Take all items out of
cabinets.
remove hardware. Determine
if you need new doors
or if your old doors can
be veneered, the old doors must be flat to be able to veneer them. Order new
Doors ahead of time
and you can start veneering the cabinet boxes
if your
using un-finished veneers.
2.
Remove all wood trim
from cabinets. See our trim section for unfinished or
Pre-finished Moldings.
Order ahead.
3.
At this time you
should repair any loose or damaged parts. Fill in any voids
wood putty, sand smooth, then seal with a Varnish or Polyurethane.
*Always follow
manufacturer directions and safety instructions before using any above
mentioned products.
GOOD LUCK WITH YOUR PROJECT!!!